The training will start with taking and signing the work permit and putting
on the necessary PPE. After that you will collect the tools needed for the
task and transport them on the cart to your task location.
When you are near the switchgear you will have to provide all the
procedures for the safe disconnection of the cell. It includes placing the
warning signs, checking the voltage, shutting down the equipment part by
part, and using different keys and tools. After the shutdown, you will use
special cart to withdraw the cell and move it away from the container.